uds34367testreport.PDF

HydroPulseä System Test (Chehalis-I) Field Test Report Prepared for U.S. Department of Energy, Federal Energy Technology Center By Tempress Technologies Inc. Under Cooperative Agreement No. DE-FC26-97FT34367 Introduction The first full-flow tests of the HydroPulseä system were carried out on December 1, 1999 at Taylor Drilling near Chehalis Washington. The objective of full-flow testing is to evaluate tool reliability in a realistic environment. The tests were carried out at full flow inside a pressurized length of tubing. Specific test objectives, test setup, instrumentation and test results are discussed below.