Industrial Team

Minimum Requirements for Industrial Team

 
PHASE I
PHASE II
PHASE III
3kW - 10kW
3kW - 10kW
3kW - 10kW
$800/kW
$600/kW
$400/kW

EFFICIENCY
(AC or DC/LHV)

Mobile - 25%
Mobile - 30%
Mobile - 30%
Stationary -35%
Stationary - 40%
Stationary - 40%
1500 hours
1500 hours
1500 hours
80% availability
85% availability
95% availability
Power 2% degradation/500
hours at a constant stack voltage hours constant stack voltage
with R 0.95.
Power 1% degradation/500
hours at a constant stack voltage hours constant stack voltage
with R 0.95.
Power 0.1% degradation/500
hours at a constant stack voltage hours constant stack voltage
with R 0.95.
R-Linear Correlation Coefficient
R-Linear Correlation Coefficient
R-Linear Correlation Coefficient
10 cycles
50 cycles
100 cycles
Power 1% degradation after 10 cycles at a
constant stack voltage.
Power 0.5% degradation after
50 cycles at a
constant stack voltage.
Power 0.1% degradation after 100 cycles at a
constant stack voltage.
TEST SEQUENCE
1. Steady State Test -
    1000 hrs
2. Transient Test
3. Steady State Test -
    500 hrs
1. Steady State Test -
    1000 hrs
2. Transient Test
3. Steady State Test -
    500 hrs
1. Steady State Test -
    1000 hrs
2. Transient Test
3. Steady State Test -
    500 hrs

For the complete duration of the Steady State and Transient Tests, operate the Prototype on either a
commercial commodity, natural gas, gasoline, or diesel fuel (s) or a representative fuel based on respectively methane, iso-octane, or hexadecane corresponding to the proposed primary application (s). Utilize external or internal primary fuel reformation or oxidation. If multiple applications using different fuels are proposed split the total test time equally among the different fuel types.

For the complete duration of the Steady State and Transient Tests, operate the Prototype on either a
commercial commodity, natural gas, gasoline, or diesel fuel (s) corresponding to the proposed primary application (s). Utilize external or internal primary fuel reformation or oxidation. If multiple applications using different fuels are proposed split the
total test time equally among the different fuel types.
For the complete duration of the Steady State and Transient Tests, operate the Prototype on either a
commercial commodity, natural gas, gasoline, or
diesel fuel (s) corresponding to the proposed primary application (s). Utilize external or internal primary fuel reformation or
oxidation. If multiple applications using different fuels are proposed split the
total test time equally
among the different
fuel types.
Design aspects should not require maintenance at intervals more frequent than 1000 hours.
Design aspects should not require maintenance at intervals more frequent than 1000 hours.
Design aspects should not require maintenance at intervals more frequent
than 1000 hours.
Not less than 40,000 operating hours for stationary applications and 5,000 hours for transportation applications for military uses.
Not less than 40,000 operating hours for stationary applications and 5,000 hours for transportation applications for military uses.
Not less than 40,000 operating hours for stationary applications and 5,000 hours for transportation applications for military uses.