CCS and Power Systems

Advanced Energy Systems - Hydrogen Turbines


Rapid Manufacturing Method for High-Temperature Turbine Components


Performer: Mikro Systems Inc.

Project No: SC0010175


Project Description

This project addresses the need for rapid, low cost manufacturing for prototype and proof-of-concept gas turbine components. This process is expected to reduce the cost of component development, compress prototyping cycle times, and increase the number of design iterations possible during the component design phase.

Tooling cost and production times

Tooling cost and production times


Project Details