CCS and Power Systems

Carbon Capture - Post-Combustion Capture


Evaluation of Concentrated Piperazine for CO2 Capture from Coal-Fired Flue Gas


Performer: URS Group Inc

Project No: FE0005654


Program Background and Project Benefits

The mission of the U.S. Department of Energy/National Energy Technology Laboratory (DOE/NETL) Existing Plants, Emissions & Capture (EPEC) Research & Development (R&D) Program is to develop innovative environmental control technologies to enable full use of the nation’s vast coal reserves, while at the same time allowing the current fleet of coal-fired power plants to comply with existing and emerging environmental regulations. The EPEC R&D Program portfolio of post- and oxy-combustion carbon dioxide (CO2) emissions control technologies and CO2 compression is focused on advancing technological options for the existing fleet of coal-fired power plants in the event of carbon constraints.

Pulverized coal (PC) plants burn coal in air to generate steam and comprise 99 percent of all coal-fired power plants in the United States. CO2 is exhausted in the flue gas at atmospheric pressure and a concentration of 10–15 percent by volume. Post-combustion separation and capture of CO2 is a challenging application due to the low pressure and dilute concentration of CO2 in the waste stream, trace impurities in the flue gas (nitrogen oxides [NOX], sulfur oxides [SOX], and particulate matter [PM]) that affect removal processes, and the parasitic energy cost associated with the capture and compression of CO2. Chemical solvents can be used to capture CO2 from flue gas by absorbing it into a liquid carrier. Although this method is used commercially to remove CO2 from industrial gases, it has not been applied to the removal of large volumes of gas as in coal-fired power plant flue gas due to significant cost and efficiency penalities.

The use of concentrated PZ—coupled with two-stage, high-temperature flash regeneration—as a solvent for absorbing CO2 from coal-fired power plant flue gas offers improved performance when compared to other solvents, including faster CO2 absorption rate, higher CO2 capacity, lower volatility, negligible thermal degradation, negligible oxidative degra-dation when used with an inhibitor, and production of CO2 at elevated pressure (resulting in lower compression costs). Further development of this solvent process to capture CO2 from coal-fired power plant flue gas will be an important advancement toward controlling CO2 emissions for existing coal combustion-based plants.

Goal

The project goal is to gain operational experience with the concentrated PZ solvent in coal-fired flue gas while employing the high-temperature, two-stage flash regeneration design. Results will be used to evaluate the technical and economic feasibility of a full-scale implementation of this process.

Objectives

Project objectives are to quantify and demonstrate the robustness of concentrated PZ with coal-fired flue gas in an integrated absorption/stripping system with solvent regeneration at 150°C; optimize the equipment design and energy performance of the innovative, two-stage flash system; and identify and resolve other potential operational and design issues including process control, corrosion, foaming, and solids precipitation.

Planned Activities

  • A three-month test of the PZ-based absorption process will be performed in coal-fired flue gas using CSIRO’s 0.1 MWe absorption column installed at a power station, coupled with the project team’s 0.1 MWe high-temperature, two-stage, flash solvent regeneration system. This test campaign will provide the first operational experience with PZ in coal-fired flue gas so that solvent degradation can be quantified over a three-month operating period, operational problems can be identified and addressed, and energy balance data can be obtained.

  • Based on the experience gathered during the CSIRO campaign, the 0.1 MWe regeneration skid design will be modified and then tested at the University of Texas’ SRP Plant. A three-week test in synthetic flue gas at 0.1 MWe scale will be conducted using the absorption column at the SRP Plant. This test campaign will verify the operation of regeneration skid modifications, as well as the ability to remove solvent impurities, if applicable, prior to finalizing a design for a 0.5 MWe regeneration skid to be used in the third field test.

  • The third field test will be on coal-fired flue gas conducted with the 0.5 MWe absorption column at the NCCC in conjunction with a 0.5 MWe regeneration skid built by the project team. The three-month test will provide useful mass and energy balance data required for scaling up the process for larger-scale testing and future commercialization.

  • An engineering feasibility study will be performed on data obtained during the three testing programs to assess the feasibility of using concentrated PZ solvent for post-combustion CO2 control. This analysis will include estimated capital and operating costs for installing and operating a full-scale system capable of achieving over 90 percent CO2 removal. Additionally, the next steps for research and development will be defined.


Project Details