Project No: FE0007741
Performer: Novozymes North America Inc.


Contacts
Shailesh D. Vora
Technology Manager
Existing Plants, Emissions & Capture
National Energy Technology Laboratory
626 Cochrans Mill Road
P.O. Box 10940
Pittsburgh, PA 15236-0940
412-386-7515
shailesh.vora@netl.doe.gov

Andrew Jones
Project Manager
National Energy Technology Laboratory
626 Cochrans Mill Road
P.O. Box 10940
Pittsburgh, PA 15236-0940
412-386-5531
andrew.jones@netl.doe.gov
 
Dr. Sonja Salmon
Principal Investigator
Novozymes North America, Inc.
77 Perry Chapel Church Road
Franklinton, NC 27525-0576
919-494-3196
SISA@novozymes.com

Duration
Award Date:  10/01/2011
Project Date:  03/31/2015

Cost
DOE Share: $1,168,670.00
Performer Share: $430,024.00
Total Award Value: $1,598,694.00

Performer website: Novozymes North America Inc. - http://www.novozymes.com

Carbon Capture - Post-Combustion Capture

Low-Energy Solvents for Carbon Dioxide Capture Enabled by a Combination of Enzymes and Ultrasonics

Project Description

Novozymes North America, Inc. (Novozymes) has teamed with the University of Kentucky, Doosan Power Systems, Ltd., and Pacific Northwest National Laboratory (PNNL) to design, build, and test an integrated bench-scale CO2 capture system that combines the attributes of the bio-renewable enzyme catalyst carbonic anhydrase (CA) with low-enthalpy absorption liquids and novel ultrasonically-enhanced regeneration. This unique CO2 capture system is expected to achieve improved efficiency, economics, and sustainability in comparison with existing CO2 capture technologies. 

The capture process will use a potassium carbonate solvent with low regeneration energy coupled with CA as a catalyst to promote higher rates of absorption in the carbonate solution. The application of ultrasonic energy forces dissolved CO2 into gas bubbles, thereby increasing the overall driving force of the solvent regeneration reaction. Additionally, through ultrasonics, a coupled effect of rectified diffusion is also believed to have the potential to drive dissolved CO2 into gas bubbles at pressures greater than the equilibrium pressure for CO2 over the solution. The combination of these synergistic technologies is projected to reduce the net parasitic load to a coal-fired power plant by as much as 51 percent compared to conventional monoethanolamine (MEA) scrubbing technology.

The project team will build on previous laboratory tests of the novel solvent and CO2 recovery technique to obtain additional laboratory data sufficient to design a bench-scale system and perform a final analysis of the technology. This bench-scale study will validate the potential of the system to provide a low cost of energy solution for post-combustion CO2 capture.


Program Background and Project Benefits

The mission of the U.S. Department of Energy/National Energy Technology Laboratory (DOE/NETL) Existing Plants, Emissions, & Capture (EPEC) Research & Development (R&D) Program is to develop innovative environmental control technologies to enable full use of the nation’s vast coal reserves, while at the same time allowing the current fleet of coal-fired power plants to comply with existing and emerging environmental regulations. The EPEC R&D Program portfolio of post- and oxy-combustion carbon dioxide (CO2) emissions control technologies and CO2 compression is focused on advancing technological options for the existing fleet of coal-fired power plants in the event of carbon constraints.

Pulverized coal (PC) plants burn coal in air to produce steam and comprise 99 percent of all coal-fired power plants in the United States. CO2 is exhausted in the flue gas at atmospheric pressure and a concentration of 10 to 15 percent by volume. Post-combustion separation and capture of CO2 is a challenging application due to the low pressure and dilute concentration of CO2 in the waste stream, trace impurities in the flue gas that affect removal processes, and the parasitic energy cost associated with CO2 capture and compression. Solvent-based CO2 capture involves selective chemical or physical absorption of CO2 from flue gas into a liquid solvent and the recovery of the CO2 from the solvent. Although this method is used commercially to remove CO2 from industrial gases, it has not been applied to the removal of CO2 from large volumes of coal-fired power plant flue gas due to significant cost and efficiency penalties. The development of solvent-based processes with low energy requirements and high capture efficiencies are a key research focus.

Successful completion of this project will result in significant progress toward reducing the monetary cost and efficiency penalties incurred with currently available CO2 removal and recovery technologies when used on PC-fired boilers. The net effect is progress toward DOE’s goal of limiting electricity cost increases due to CO2 emissions control to 35 percent, while capturing at least 90 percent of the CO2 from the flue gas. It is anticipated that the proposed system will be able to be incorporated into existing coal-fired plants without major obstacles, providing a viable route for enabling CO2 emissions reductions while keeping coal a major energy resource.

Project Goal

The overall project goal is to further develop a solvent-based post-combustion CO2 capture technology and verify its ability to significantly reduce parasitic energy requirements and make significant progress toward meeting DOE cost and efficiency targets.

Objectives

The project objectives are to advance the novel capture technology through design, integration, and testing at bench-scale using best-candidate components from prior research by (1) obtaining sufficient laboratory data to fully support an analysis of the technology being developed; (2) performing bench-scale pilot work that will prove and refine the earlier analyses and confirm the suitability of the CA catalyst; (3) fully evaluating the technical and economic suitability of the process, including a commercial design and cost estimate; and (4) utilizing the pilot data to refine the technical analysis, update the commercial plant design and costs and identify environmental, health, and safety (EH&S) issues.

Planned Activities


Accomplishments

Project kick-off meeting held in November 2011.