Search Publications
Download Updated Costs (June 2011 Basis) for Selected Bituminous Baseline Cases
<< Return NETL/DOE-341082312

Date: 8/23/2012
Type: Report
Status: Active
NETL Contact: Timothy Fout
Technology Focus Area(s): Carbon Storage; Advanced Combustion Systems; Gasification Systems; Advanced Turbines
Analysis Focus Area(s):
Author(s): Elsy Varghese (WorleyParsons Group); Lora L Pinkerton (WorleyParsons Group); Mark Woods (Booz Allen Hamilton)

Product Description
The Cost and Performance Baseline for Fossil Energy Power Plants, Volume 1: Bituminous Coal and Natural Gas to Electricity (Nov 2010) establishes performance and cost data for fossil energy power systems, specifically integrated gasification combined cycle (IGCC) plants fueled with bituminous coal, pulverized coal (PC) plants fueled with bituminous coal, and natural gas combined cycle (NGCC) plants all with and without carbon capture and sequestration. The cost basis for that report was June 2007. This present report updates the cost of selected cases from that report to June 2011 dollars.