Title: Cost and Performance Baseline for Fossil Energy Plants - Volume 1: Bituminous Coal and Natural Gas to Electricity
Publication Number: DOE/NETL-2010/1397
Publication Date: 11/2010
Publication Type: Report/Publication
Contact: James Black
Program/Technology: Environmental & Water
Combustion
Carbon Sequestration
Gasification
Turbines
Author: Kristen Gerdes (NETL)
John Haslbeck (RDS)
Norma Kuehn (RDS)
Eric Lewis (Booz Allen Hamilton)
Lora L. Pinkerton (WorleyParsons Group, Inc.)
Mark Woods (Booz Allen Hamilton)
James Simpson (WorleyParsons Group, Inc.)
Marc J. Turner (Booz Allen Hamilton)
Elsy Varghese (WorleyParsons Group, Inc.)
Synopsis:

The Cost and Performance Baseline for Fossil Energy Power Plants Study, Volume 1: Bituminous Coal and Natural Gas to Electricity establishes performance and cost data for fossil energy power systems, specifically integrated gasification combined cycle, pulverized coal, and natural gas combined cycle plants all with and without carbon capture and sequestration. The analyses were performed on a consistent technical and economic basis that accurately reflects current market conditions. The study serves as a benchmark to track the progress of DOE Advanced Power Systems R&D and as a baseline for analyzing fossil energy plant options. NOTE: Click here for additional Cost and Performance Baseline for Fossil Energy Power Plants information.